A1376/26
ADLighting Systems

Runway 04/22 secondary power supply switch-over time exceeds the limit during low-visibility operations.

2026-11-14 08:12 - 2026-11-30 21:59
Duration:17 days

Period of Applicability

2026-11-14 08:12 - 2026-11-30 21:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

During low-visibility operations, the runway 04/22 secondary power supply switch-over time exceeds one second.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1376/26 NOTAMR A1293/26
Q)LBSR/QFAXX/IV/NBO/A/000/999/4234N02731E005
A)LBBG
B)2611140812 C)2611302159
E)LOW VIS OPS:
RWY 04/22 SECONDARY POWER SUPPLY SWITCH-OVER TIME MORE THAN 1 SEC.