A1203/26
Checking status...
ADLighting Systems

Runway 09/27 secondary power supply switch-over exceeds one second.

2026-10-14 12:38 - 2026-10-16 14:00
Duration:SHORT3 days

Period of Applicability

2026-10-14 12:38 - 2026-10-16 14:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

The secondary power supply switch-over time for runway 09/27 is more than one second.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1203/26 NOTAMR A1200/26
Q)LBSR/QLRXX/IV/NBO/A/000/999/4314N02750E005
A)LBWN
B)2610141238 C)2610161400
E)SECONDARY POWER SUPPLY SWITCH-OVER TIME
MORE THAN 1 SEC FOR RWY 09/27.