B1108/26
Checking status...
NavApproach Procedures

LDLO RNP RWY 02 LPV Category B OCA/H is changed.

2026-09-04 11:01 - 2026-11-25 23:59
Duration:3 months

Period of Applicability

2026-09-04 11:01 - 2026-11-25 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

For the LDLO RNP RWY 02 instrument approach procedure, the LPV Category B OCA/H is changed to 608 ft (479 ft). Refer to AIP chart LDLO AD 2.24.12 IAC RNP RWY02.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B1108/26 NOTAMR B0955/26
Q) LDZO/QPICH/I /NBO/A /000/999/4434N01424E005
A) LDLO B) 2609041101 C) 2611252359
E) LDLO RNP RWY02
-CHANGE LPV CAT B OCA/H TO 608 (479)
REF AIP CHART LDLO AD 2.24.12 IAC RNP RWY02
Was this helpful?