R2821/26
Checking status...
OpsUAS/Drone Operations

Unmanned aircraft operations will take place at Alhaurín de la Torre.

2026-08-10 07:00 - 2026-11-06 04:00
Duration:aggregated 3 months

Period of Applicability

2026-08-10 07:00 - 2026-11-06 04:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Unmanned aircraft operations will take place at Alhaurín de la Torre within the area bounded by 364143N 0043507W, 364135N 0043458W, 364119N 0043457W, 364111N 0043516W, 364129N 0043512W, and 364143N 0043507W. Scheduled August 10 from 0700 to 2359; August 11 through November 5 daily from 0000 to 0400 and 0700 to 2359; and November 6 from 0000 to 0400.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

R2821/26 NOTAMN
Q) LECM/QWULW/IV/BO /AW/000/004/3641N00435W001
A) LEMG B) 2608100700 C) 2611060400
D) AUG 10 0700-2359, AUG 11-30 0000-0400 0700-2359, SEP 01-30
0000-0400 0700-2359, OCT 01-31 0000-0400 0700-2359, NOV 01-05
0000-0400 0700-2359, NOV 06 0000-0400
E) UNMANNED ACFT FLYING WI COORD:
364143N 0043507W - 364135N 0043458W -
364119N 0043457W - 364111N 0043516W -
364129N 0043512W - 364143N 0043507W
ALHAURIN DE LA TORRE
F) SFC G) 00120M AGL
Was this helpful?