B7389/26
PERM
Checking status...
NavApproach Procedures

LEZG STAR charts correct the TON holding headings and confirm the ZAR headings published on STAR 1.1.

2026-10-01 00:00 - PERM
Duration:PERMANENT

Period of Applicability

2026-10-01 00:00 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Effective 1 October 2026, on AD 2 LEZG STAR 1.1/2.1 AIRAC 09/26, the TON holding headings are corrected from 087°/267° to 084°/264°. For the ZAR holding, the correct headings are those published in AD 2 LEZG STAR 1.1 AIRAC 09/26.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B7389/26 NOTAMN
Q) LECM/QPAXX/I /NBO/A /000/999/4140N00103W005
A) LEZG B) 2610010000 C) PERM
E) REF AD 2 LEZG STAR 1.1/2.1 AIRAC 09/26 (WEF 01-OCT-26):
HOLDING OVER TON:
-WHERE IT STATES: 087DEG  267DEG
-IT SHOULD STATE: 084DEG  264DEG
HOLDING OVER ZAR:
THE CORRECT HEADINGS ARE THOSE PUBLISHED IN:
AD 2 LEZG STAR 1.1 AIRAC 09/26 (WEF 01-OCT-26)
Was this helpful?