B4377/25
Checking status...
NavDeparture Procedures

Omnidirectional departures from RWY 22 west sector require a higher climb gradient when ZRT OCHEY is active.

2025-10-03 11:56 - 2026-12-31 23:59
Duration:VERY LONG16 months

Period of Applicability

2025-10-03 11:56 - 2026-12-31 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

When ZRT OCHEY is activated, omnidirectional departures from RWY 22 (west sector) are modified to require a minimum climb slope of 4 percent (per SUP AIP 167/25).

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) LFEE/QPDLT/I /NBO/A /000/999/4859N00615E005
A) LFJL B) 2510031156 C) 2612312359
E) OMNIDIRECTIONAL DEPARTURES RWY 22 'WEST SECTOR' MODIFIED WHEN 
'ZRT OCHEY' IS ACTIVATED (SUP AIP 167/25): MINIMUM SLOPE 4 PERCENT.
REF AIP : AD 2 LFJL.AD 2.22.3.1.2
Was this helpful?