C3695/26
Checking status...
ADRunway Operations

Runway 30 TORA, TODA, ASDA, and LDA are revised due to an obstacle within the RESA.

2026-09-16 15:10 - 2026-12-15 12:00
Duration:LONG3 months

Period of Applicability

2026-09-16 15:10 - 2026-12-15 12:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Runway 30 declared distances are revised due to an obstacle within the runway end safety area (RESA): TORA, TODA, ASDA, and LDA are each 1,888 metres.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

C3695/26 NOTAMR C2478/26
Q) LFRR/QMDCH/IV/NBO/A /000/999/4910N00027W005
A) LFRK B) 2609161510 C) 2612151200
E) DECLARED DISTANCES CHANGED :
RWY 30 REVISED DECLARED DISTANCES (OBST WI RESA) :
TORA = TODA = ASDA = LDA = 1888M.
Was this helpful?