A3500/26
Checking status...
ADRunway Operations

Runway 03L/21R work requires advance coordination for non-emergency technical diversions or ferry flights that may block the runway.

2026-09-23 00:00 - 2026-12-31 23:59
Duration:LONG4 months

Period of Applicability

2026-09-23 00:00 - 2026-12-31 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Due to work in progress on runway 03L/21R, operators must coordinate in advance with the airport operator at ASOC telephone +30 210 3540000 for any non-emergency technical diversion or ferry flight with a known defect that may cause runway blockage. Operators must account for the work when selecting an alternate aerodrome and planning fuel. Emergency flights are unaffected.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A3500/26 NOTAMN
Q) LGGG/QMRLT/IV/NBO/A /000/999/3756N02357E005
A) LGAV B) 2609230000 C) 2612312359
E) DUE TO WIP ON RWY 03L/21R, ACFT OPERATORS ARE REQUESTED TO
COORDINATE IN ADVANCE WITH THE AIRPORT OPERATOR (ASOC TEL +30 210
3540000) ANY NON-EMERGENCY TECHNICAL DIVERSION OR FERRY FLT WITH A
KNOWN DEFECT WHICH MAY RESULT IN RWY BLOCKAGE. OPERATORS SHALL TAKE
THE WIP INTO CONSIDERATION WHEN SELECTING ALTN AD AND FOR FUEL
PLANNING. EMERGENCY FLT ARE NOT AFFECTED.