ADRunway Operations

RWY 19 is partially unserviceable for rehabilitation, with reduced temporary runway length and revised declared distances.

2026-09-13 04:00 - 2026-12-13 21:00
Duration:LONG4 months

Period of Applicability

2026-09-13 04:00 - 2026-12-13 21:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Runway rehabilitation is in progress, with 420 m of RWY 19 unserviceable and the temporary runway length reduced to 1,030 m. Machinery up to 4.5 m high operates in the area from 0400 to 1400 UTC, Monday through Friday, and is moved during landings and take-offs to avoid affecting take-off and approach surfaces. Declared distances are RWY 01 TORA/TODA/ASDA 1,030 m and LDA 890 m; RWY 19 TORA/TODA/ASDA 1,030 m and LDA 915 m. Temporary runway edge, end and threshold lights and an aiming point are provided.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B1389/26 NOTAMR B1002/26
Q) LGGG/QMDCH/IV/NBO/A /000/999/3821N02608E005
A) LGHI B) 2609130400 C) 2612132100
E) RWY REHABILITATION WIP. 420M RWY 19 U/S.
MACHINERY UP TO HGT 4.5M OPERATING IN AREA BTN 0400-1400UTC MON-FRI.
MACHINERY REMOVED DURING LANDINGS AND TAKE-OFFS TO AREA NOT
AFFECTING TAKE-OFF AND APPROACH SURFACES.
TEMPORARY RWY LENGTH 1030M
NEW DECLARED DISTANCES AS FLW:
RWY 01 TORA/TODA/ASDA 1030M
RWY 01 LDA 890M
RWY 19 TORA/TODA/ASDA 1030M
RWY 19 LDA 915M
RWY 01 END 382044.5356N 260827.8021E
RWY 01 END ELEVATION 4.50M
THR 19 382040.8078N 260827.0028E
THR 19 ELEVATION 4.48M
RWY EDGE END AND THR LIGHTS PROVIDED.
AIMING POINT PROVIDED.