A2779/26
Checking status...
OBSCrane Operations

Port cranes 8 and 9 are erected and moving near runway 09/27.

2026-08-06 05:00 - 2026-08-07 19:00
Duration:SHORTaggregated 2 days

Period of Applicability

2026-08-06 05:00 - 2026-08-07 19:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Port cranes 8 and 9 are erected and moving 700–1,200 m from the runway 27 end and 180–540 m north of the runway 09/27 centerline. Crane 8 is 73 m AMSL and crane 9 is 65 m AMSL. If operationally necessary, crane lowering requires 30 minutes' prior notice. Active on the 6th and 7th from 0500 to 1900.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2779/26 NOTAMN
Q) LGGG/QOBCE/IV/M  /AE/000/003/3520N02511E002
A) LGIR B) 2608060500 C) 2608071900
D) 06 07 0500-1900
E) PORT CRANES 8 9 ERECTED. REF AIP AD2-LGIR-AOC A-2
CRANE 8 OBST HGT 73M/AMSL
CRANE 9 OBST HGT 65M/AMSL
CRANES MOVING 700M-1200M FROM RWY 27 END AND 180M-540M NORTH OF
CENTERLINE RWY 09/27.
IN CASE IT IS NECESSARY TO LOWER THE CRANES, FOR OPR REASONS, A
30MIN PRIOR PN.
Was this helpful?