A3390/26
Checking status...
OBSCrane Operations

Port cranes 8 and 9 are raised and moving near RWY 09/27.

2026-09-14 12:00 - 2026-09-15 19:00
Duration:VERY SHORTaggregated 21 hours

Period of Applicability

2026-09-14 12:00 - 2026-09-15 19:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Port cranes 8 and 9 are raised and moving 700–1,200 m from the RWY 27 end and 180–540 m north of the RWY 09/27 centerline. Crane 8 is 73 m AMSL and crane 9 is 65 m AMSL. Lowering the cranes for operational reasons requires 30 minutes' prior notice. Effective September 14 from 1200 to 1900 and September 15 from 0500 to 1900.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A3390/26 NOTAMN
Q) LGGG/QOBCE/IV/M  /AE/000/003/3520N02511E005
A) LGIR B) 2609141200 C) 2609151900
D) SEP 14 1200-1900,15 0500-1900
E) PORT CRANES 8-9 RAISED. REF AIP AD2-LGIR-AOC A-2
CRANE 8: OBSTACLE HEIGHT 73M/AMSL
CRANE 9: OBSTACLE HEIGHT 65M/AMSL
CRANES MOVING 700-1200 M FROM RWY 27 END AND 180-540 M NORTH OF
CENTERLINE RWY 09/27.
IN CASE IT IS NECESSARY TO LOWER THE CRANES, FOR OPERATIONAL
REASONS, A 30 MINS PN IS REQUIRED.