A4877/26
EST
Checking status...
OBSConstruction Activity

Two obstacles have been erected next to Apron 3.

2026-07-20 07:21 - 2026-10-20 21:59
Duration:LONG4 months EST

Period of Applicability

2026-07-20 07:21 - 2026-10-20 21:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Two obstacles have been erected next to Apron 3. The electrical poles are 20 m AGL at positions 464143.07N 0170936.65E and 464151.37N 0170932.05E. Obstacle lighting is installed according to ICAO Annex 14.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A4877/26 NOTAMR A2317/26
Q) LHCC/QOBCE/IV/M  /A /000/999/4641N01710E005
A) LHSM B) 2607200721 C) 2610202159EST
E) TWO OBSTACLES ERECTED NEXT TO APRON 3.
THE HEIGHT OF THE ELECTRICAL POLES ARE 20M AGL.
PSN OF THE POLES ARE 464143.07N 0170936.65E AND 464151.37N
0170932.05E. OBST LIGHTING INSTALLED ACCORDING TO ICAO ANNEX 14.
Was this helpful?