Period of Applicability
2026-10-30 08:30 - 2026-11-06 15:19
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
A crane is erected 0.5 NM east of the runway 16R touchdown zone, with a maximum height of 21 m above ground level. The schedule is October 30 from 0830 to sunset and October 31 through November 6 from sunrise to sunset.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?