Period of Applicability
2025-10-01 22:01 - PERM
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
LIBF published reduced visibility operating procedures and minima: take-off visibility not less than 800 m and landing visibility not less than 1500 m; when parts of the movement area cannot be visually monitored by ATS, RAVP applies with capacity reduction, no simultaneous aircraft in non-visible areas, and below 400 m visibility only one aircraft on the manoeuvring area with follow-me mandatory; at visibility less or equal to 75 m, condition 3 procedures apply; training activities are not allowed during RAVP; ground movements with RVR/visibility less than 400 m require follow-me.