B1384/26
PERM
Checking status...
OpsOperating Restrictions

Engine run-ups restricted to TWY T between TWY N and TWY F; prohibited on Apron 1 and Apron 3.

2026-03-04 16:21 - PERM
Duration:PERMANENT

Period of Applicability

2026-03-04 16:21 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Engine run-ups must be conducted, when available, on the portion of TWY T between TWY N and TWY F, and are forbidden on Apron 1 and Apron 3.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B1384/26 NOTAMN
Q) LIBB/QFAXX/V /NBO/A /000/999/4031N01724E005
A) LIBG B) 2603041621 C) PERM
E) ENGINE RUN UPS CHANGE AS FLW:
3.3.1 EVERY ENGINE RUN UP SHALL BE CARRIED OUT, AS A PRINCIPLE AND
WHEN AVAILABLE, ON PORTION OF TWY 'T' BETWEEN TWY 'N' AND TWY 'F',
WHOSE LOCATION IS REPORTED IN AIP ITALIA AD 2 LIBG 2-1
3.3.2 ENGINE RUN-UPS ARE FORBIDDEN ON APRON1 AND APRON 3
REF AIP AD2 LIBG 1-14 ITEM 2-21 'NOISE ABATEMENT PROCEDURES', POINT
3.3 'ENGINE RUN UPS'
Was this helpful?