B6265/26
EST
Checking status...
OBSConstruction Activity

A new unmarked building penetrates the runway 05 takeoff climb and inner horizontal surfaces.

2026-10-04 10:23 - 2026-12-30 22:00
Duration:3 months EST

Period of Applicability

2026-10-04 10:23 - 2026-12-30 22:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

A new building has been erected at 370053.7N 0143833.2E, penetrating the runway 05 takeoff climb surface and inner horizontal surface. It is 7 m (22 ft) AGL and 288 m (946 ft) AMSL, and is not provided with an ICAO signal. Refer to AIP AD 2 LICB 3-3.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B6265/26 NOTAMR B4312/26
Q) LIRR/QOBCE/IV/M  /A /000/999/3700N01437E005
A) LICB B) 2610041023 C) 2612302200EST
E) NEW OBST BUILDING ERECTED PENETRATING TKOF CLIMB SFC RWY05 AND
INNER HORIZONTAL SFC PSN COORD (WGS-84): 370053.7N 0143833.2E
MAX ELEV AGL 7M/22FT MAX ELEV AMSL 288M/946FT.
RMK: ICAO SGL UNPROVIDED
REF AIP AD 2 LICB 3-3
Was this helpful?