Period of Applicability
2026-09-03 13:30 - 2026-09-06 13:10
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Due to the activity announced by NOTAM W4029/26, transition-to-enroute procedures ARLES 1B, ARLES 1R, OMETO 1B, and OMETO 1R are suspended. ARLES 1D and OMETO 1D require a minimum crossing level of FL100 over LEGLO, while ARLES 1K and OMETO 1K require a minimum crossing level of FL100 over BRL VOR. These restrictions will be applied tactically on the 3rd from 1330 to 1400 and the 6th from 1230 to 1310; reference AIP AD 2 LIME 6.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?