M4956/26
EST
Checking status...
ADRunway Operations

The BLISS BAK12 arresting cable on runway 08 is temporarily removed.

2026-09-13 16:15 - 2026-12-11 23:59
Duration:LONG3 months EST

Period of Applicability

2026-09-13 16:15 - 2026-12-11 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

The BLISS BAK12 arresting cable on runway 08 has been temporarily removed. Reference: MILAIP AD 2 LIPS 1-7.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

M4956/26 NOTAMR M3941/26
Q) LIMM/QMHXX/IV/BO/A/000/999/4541N01205E005
A) LIPS
B) 2609131615 C) 2612112359EST
E) CABLE BLISS BAK12 RWY08 TEMPORARY REMOVED
REF MILAIP AD 2 LIPS 1-7
Was this helpful?