A5748/26
PERM
Checking status...
WxMeteorological Equipment

A new ceilometer has been installed at the runway 33 threshold.

2026-10-28 20:00 - PERM
Duration:PERMANENT

Period of Applicability

2026-10-28 20:00 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

A new ceilometer has been installed at the threshold of runway 33. Refer to AIP GEN 3.5-28.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A5748/26 NOTAMN
Q) LIRR/QFCCS/IV/M  /A /000/999/4148N01236E005
A) LIRA B) 2610282000 C) PERM
E) NEW CEILOMETER THR RWY33 IMPLEMENTED
REF AIP GEN 3.5-28
Was this helpful?