A0804/26
EST
Checking status...
NavApproach Procedures

LJPZ RNP RWY 15 LPV OCA/H values are changed.

2026-05-21 15:00 - 2026-08-21 15:00
Duration:LONG4 months EST

Period of Applicability

2026-05-21 15:00 - 2026-08-21 15:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

LJPZ RNP RWY 15 LPV OCA/H is changed as follows: CAT A 2.5% to 770(765), CAT A 3% to 760(755), CAT A 4% to 740(735), CAT A 5% to 740(735); CAT B 2.5% to 800(795), CAT B 3% to 790(785), CAT B 4% to 780(775), CAT B 5% to 760(755). Refer AIP chart LJPZ AD 2.24.12-3 IAC RNP RWY 15. Due to ICAO EB 2026/13.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0804/26 NOTAMN
Q) LJLA/QPICH/I /NBO/A /000/999/4528N01337E005
A) LJPZ B) 2605211500 C) 2608211500EST
E) LJPZ RNP RWY 15 CHANGE LPV OCA/H AS FOLLOWS:
CAT A 2.5(PERCENT) TO 770(765)
CAT A 3(PERCENT)   TO 760(755)
CAT A 4(PERCENT)   TO 740(735)
CAT A 5(PERCENT)   TO 740(735)
CAT B 2.5(PERCENT) TO 800(795)
CAT B 3(PERCENT)   TO 790(785)
CAT B 4(PERCENT)   TO 780(775)
CAT B 5(PERCENT)   TO 760(755)
REF AIP CHART LJPZ AD 2.24.12-3 IAC RNP RWY 15
NOTE: DUE TO ICAO EB 2026/13
Was this helpful?