Change in secondary power supply switch-over time for lighting system at LKKB.
2024-10-31 23:00 - PERM
Period of Applicability
2024-10-31 23:00 - PERM
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
The maximum switch-over time for the complete lighting system has been changed from a maximum of 15 seconds to a maximum of 1 second.
Message
REF AIP CR AD 2-LKKB-1-6 / AD 2.15 OTHER LIGHTING, SECONDARY POWER SUPPLY/ - 4 SECONDARY POWER SUPPLY/SWITCH-OVER TIME FOR COMPLETE LIGHTING SYSTEM - CHANGE TO READ: MAX 1 S INSTEAD OF MAX 15 S. - 5...
Map Visualization
Preview
Loading map data
Please wait...
© OpenStreetMap contributors