B3234/24
Checking status...
Lighting Systems

Change in secondary power supply switch-over time for lighting system at LKKB.

2024-10-31 23:00 - PERM

Period of Applicability

2024-10-31 23:00 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The maximum switch-over time for the complete lighting system has been changed from a maximum of 15 seconds to a maximum of 1 second.

Message

REF AIP CR AD 2-LKKB-1-6 / AD 2.15 OTHER LIGHTING, SECONDARY POWER SUPPLY/ - 4 SECONDARY POWER SUPPLY/SWITCH-OVER TIME FOR COMPLETE LIGHTING SYSTEM - CHANGE TO READ: MAX 1 S INSTEAD OF MAX 15 S. - 5...

Map Visualization

Preview
Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B3234/24 NOTAMN
Q) LKAA/QLRXX/IV/NBO/A/000/999/5007N01433E005
A) LKKB B) 2410312300 C) PERM
E) REF AIP CR AD 2-LKKB-1-6 / AD 2.15 OTHER LIGHTING, SECONDARY POWER
SUPPLY/
- 4 SECONDARY POWER SUPPLY/SWITCH-OVER TIME FOR COMPLETE LIGHTING
SYSTEM - CHANGE TO READ: MAX 1 S  INSTEAD OF  MAX 15 S.
- 5 REMARKS - CHANGE TO READ: THE ENTIRE LIGHTING SYSTEM IS BACKED
UP BY TWO SECONDARY POWER SUPPLY AND TWO UPS