A1375/26
Checking status...
OBSTemporary Obstacles

A mobile crane is erected in the runway 30 approach lighting system axis.

2026-08-31 05:30 - 2026-11-06 14:30
Duration:aggregated 26 days

Period of Applicability

2026-08-31 05:30 - 2026-11-06 14:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

A mobile crane is erected at 50°05'16.89"N 014°17'12.52"E, in the runway 30 approach lighting system axis, with a maximum height of 8 m AGL and elevation of 383.2 m AMSL. It has day and night marking and is present daily from 0530 to 1430.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1375/26 NOTAMN
Q) LKAA/QOBCE/IV/M/A/000/999/5006N01416E005
A) LKPR B) 2608310530 C) 2611061430
D) DAILY 0530-1430
E) OBST - MOBILE CRANE PSN 500516,89N 0141712,52E
(IN AXIS ALS RWY 30). MAX HGT 8M AGL/ELEV 383,2M AMSL. DAY AND NIGHT
MARKING.
Was this helpful?