A1831/26
EST
Checking status...
OpsFlight Procedures

Runway static run-ups require advance notice to ATC, and ice shedding requires ATC approval.

2026-11-06 08:48 - 2027-02-06 23:59
Duration:LONG4 months EST

Period of Applicability

2026-11-06 08:48 - 2027-02-06 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Pilots planning a static run-up on the runway before takeoff must advise ATC as soon as possible and adhere to the duration they report for separation planning. Ice shedding requires ATC approval and should preferably take place on a taxiway at a position assigned by ATC.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1831/26 NOTAMN
Q) LKAA/QFAXX/IV/BO/A/000/999/5006N01416E005
A) LKPR B) 2611060848 C) 2702062359EST
E) PILOTS INTENDING TO PERFORM A STATIC RUN UP ON THE RWY PRIOR TO
TAKE-OFF ARE REQUIRED TO ADVISE ATC AS SOON AS POSSIBLE. THE REPORTED
DURATION MUST BE ADHERED TO. IT IS IMPORTANT FOR SEPARATION PLANNING.
PILOTS INTENDING TO PERFORM ICE SHEDDING MUST REQUEST ATC APPROVAL.
ICE SHEDDING SHOULD PREFERABLY BE PERFORMED ON TWY. ATC WILL ASSIGN
THE POSITION.
Was this helpful?