V0360/26
Checking status...
NavDeparture Procedures

Runway 26 SIDs are amended with a minimum climb gradient of 213 FPM until passing 4000.

2026-05-12 15:42 - 2026-08-05 20:59
Duration:3 months

Period of Applicability

2026-05-12 15:42 - 2026-08-05 20:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Standard instrument departure for runway 26 is amended for all runway 26 SIDs (DAFNA E, MERVA E, SALAM E, SUVAS E, TOMAL E). Minimum climb gradient is 213 FPM until passing 4000; corresponding speeds and climb rates are 60/213, 120/426, 180/639, 240/852, 300/1065, and 360/1278 KTS/V/V FPM.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

V0360/26 NOTAMN Q) LLLL/QPICH/I/BO/A/000/999/3200N03453E005 A) LLBG B) 2605121542 C) 2608052059 E) [US DOD PROCEDURAL NOTAM] STANDARD INSTRUMENT DEPARTURE (SID) AMENDMENT SID RWY 26 (DAFNA E, MERVA E, SALAM E, SUVAS E, TOMAL E) ALL RWY 26 SIDS; MIN CLIMB GRADIENT 213 FPM UNTIL PASSING 4000; KTS/V/V FPM: 60/213, 120/426, 180/639, 240/852, 300/1065, 360/1278.​
Was this helpful?