A5651/26
EST
Checking status...
OpsFlight Procedures

LPCS radio communication failure procedures have changed.

2026-10-12 08:00 - 2026-11-20 23:59
Duration:2 months EST

Period of Applicability

2026-10-12 08:00 - 2026-11-20 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

The LPCS radio communication failure procedure has changed due to replacement of DVOR/DME CAS. Squawk A7600. Following failure after takeoff, maintain the last assigned level or FL060, whichever is higher, for two minutes, then climb to the cruising level in the current flight plan (CPL). Under vectoring, maintain the last cleared and acknowledged heading and level for two minutes, then rejoin the CPL route and climb to its cruising level. If cleared direct to a point, fly at the cleared and acknowledged level or FL060, whichever is higher, for two minutes, then rejoin the CPL route and climb to its cruising level.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A5651/26 NOTAMN
Q) LPPC/QPRCH/IV/BO /AE/000/999/3844N00921W005
A) LPCS B) 2610120800 C) 2611202359EST
E) LPCS AD2.22 3.1 III RADIO COMMUNICATIONS FAILURE PROCEDURE
CHANGED TO:
RADIO COMMUNICATION FAILURE IN THE EVENT OF RCF SQUAWK A7600:
- IN CASE OF RCF AFTER TAKE-OFF, MAINTAIN LAST ASSIGNED LEVEL (OR
FL060 IF IS HIGHER THAN THE LAST ASSIGNED LEVEL) FOR 2 MINUTES, THEN
CLIMB TO THE CRUISING LEVEL STATED IN THE CPL.
- ACFT UNDER VECTORING SHALL CONTINUE ON LAST CLEARED AND
ACKNOWLEDGED HEADING AND LEVEL FOR 2 MINUTES, THEN REJOIN THE CPL
ROUTE AND CLIMB TO THE CRUISING LEVEL STATED IN CPL.
- ACFT CLEARED DCT TO..., FLY AT/TO THE CLEARED AND ACKNOWLEDGED
LEVEL OR TO FL060, WHICHEVER IS HIGHER, FOR 2 MINUTES THEN REJOIN
THE CURRENT FLIGHT PLAN ROUTE AND CLIMB TO THE CRUISING LEVEL STATED
IN CPL.
DUE TO DVOR/DME CAS REPLACEMENT.
Was this helpful?