Period of Applicability
2026-09-08 14:29 - PERM
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
At LPFR, during normal visibility operations (NVO), secondary generators provide alternative power with a switch-over time of less than 15 seconds. During low visibility operations (LVO), one generator is the primary source, while the national power grid or second LPFR generator is the standby source, providing a switch-over time of less than 1 second. This information relates to AIP LPFR AD 2.15.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?