B0848/26
Checking status...
NavApproach Procedures

IGS RWY 01 approach procedure changed.

2026-04-29 12:00 - 9999-12-31 23:59
Duration:VERY LONG97078 months

Period of Applicability

2026-04-29 12:00 - 9999-12-31 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Instrument approach procedure IGS RWY 01 OCA(H) values are replaced by new values: missed approach climb gradient requirements 2.5% 4080(3180), 5.0% 3300(2400), 6.0% 3000(2100), 7.0% 2700(1800), and 9.0% 2190(1290). Ref AIP LSZA AD 2.24.10-1.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B0848/26 NOTAMN
Q) LSAS/QPOCH/I/NBO/A/000/999/4600N00855E005
A) LSZA B) 2604291200 C) PERM
E) IAP IGS RWY 01
OCA(H) RPLC BY FLW VALUES:
MISSED APCH CLIMB GRADIENT REQUIREMENT 2.5 PCT 4080(3180)
MISSED APCH CLIMB GRADIENT REQUIREMENT 5.0 PCT 3300(2400)
MISSED APCH CLIMB GRADIENT REQUIREMENT 6.0 PCT 3000(2100)
MISSED APCH CLIMB GRADIENT REQUIREMENT 7.0 PCT 2700(1800)
MISSED APCH CLIMB GRADIENT REQUIREMENT 9.0 PCT 2190(1290).
REF AIP LSZA AD 2.24.10-1.
Was this helpful?