A0829/26
ADApron Operations

Single-engine operations by multiengine aircraft are unavailable on the south apron between taxiway N and runway 28.

2026-11-09 13:21 - 2027-01-27 04:00
Duration:3 months

Period of Applicability

2026-11-09 13:21 - 2027-01-27 04:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

On the south apron between taxiway N and runway 28, single-engine operations by multiengine aircraft are not available.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0829/26 NOTAMR A0779/26
Q) LSAS/QMNLT/IV/NBO/A/000/999/4727N00833E005
A) LSZH B) 2611091321 C) 2701270400
E) APN SOUTH BTN TWY N AND RWY 28 NO SINGLE ENG OPS AVBL FOR
MULTIENGINE ACFT.
Was this helpful?