J4240/26
Checking status...
OBSCrane Operations

An obstacle-lighted tower crane is erected.

2026-10-06 10:00 - 2027-01-06 17:00
Duration:LONG4 months

Period of Applicability

2026-10-06 10:00 - 2027-01-06 17:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

A tower crane is erected within the area defined by coordinates 365314.59N 0304800.21E, 365314.57N 0304800.49E, 365314.80N 0304800.52E, and 365312.18N 0304759.87E. The site elevation is 51.85 m, the crane height is 54.60 m, and the top elevation is 106.45 m. The crane is obstacle-lighted.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) LTAA/QOBCE/IV/M  /A /000/999/3654N03048E005
A) LTAI B) 2610061000 C) 2701061700
E) TOWER CRANE AT THE FOLLOWING COORDINATES:
365314.59N0304800.21E
365314.57N0304800.49E
365314.80N0304800.52E
365312.18N0304759.87E

ELEVATION       : 51.85 M
CRANE HEIGHT    : 54.60 M
ELEVATION AT TOP: 106.45 M 
OBST LIGHT      : YES
Was this helpful?