J4641/26
Checking status...
ADRunway Operations

Work and digging are in progress before runway 18 threshold.

2026-10-29 09:11 - 2026-11-30 14:00
Duration:2 months

Period of Applicability

2026-10-29 09:11 - 2026-11-30 14:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Work is in progress 60 m before runway 18 threshold, with digging 70 m before the threshold to a depth of 3 m and width of 4 m. Follow tower instructions.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

J4641/26 NOTAMN
Q) LTAA/QMRHW/IV/BO /A /000/999/4130N03205E005
A) LTAS B) 2610290911 C) 2611301400
E) WIP ON 60M BEFORE THR 18
DIGGING WORKS ON 70M BEFORE THR 18,
-DEPTH 3M
-WIDTH 4M
ADVISE TWR INSTRUCTIONS
Was this helpful?