J3520/26
Checking status...
ADTaxiway Operations

Taxiway G left paved shoulder is unavailable due to work in progress.

2026-08-27 06:17 - 2026-11-27 14:00
Duration:LONG4 months

Period of Applicability

2026-08-27 06:17 - 2026-11-27 14:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

The left paved shoulder of Taxiway G is unavailable due to work in progress for the first 100 meters from the apron; Taxiway G remains 22 meters wide.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

J3520/26 NOTAMR J2186/26
Q) LTAA/QMAXX/IV/NBO/A /000/999/3826N03805E005
A) LTAT B) 2608270617 C) 2611271400
E) NO PAVED SHOULDER DUE TO WIP ON TWY G SHOULDER, FIRST 100 METERS
FROM APRON, LEFT SHOULDER OF TWY G. TWY G WIDTH 22 METERS.