B2128/26
EST
Checking status...
OBSConstruction Activity

Construction-related obstacles are erected west of RWY 16R/34L between TWYs A and B.

2026-05-22 10:26 - 2026-08-17 14:00
Duration:3 months EST

Period of Applicability

2026-05-22 10:26 - 2026-08-17 14:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

A 15 m glidepath obstacle and a 4 m shelter obstacle are present in the strip area west of RWY 16R/34L between TWYs A and B, 120 m from the centre line, due to construction works for ILS montage on RWY 16R/34L. The glidepath obstacle top elevation is 141 m and the shelter top elevation is 119 m. Coordinates: ANTEN 381648.85N0270925.30E, top elevation 126 m; shelter 381649.01N0270925.32E, top elevation 115 m.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B2128/26 NOTAMN
Q) LTBB/QOBCE/IV/M  /AE/000/005/3817N02709E005
A) LTBJ B) 2605221026 C) 2608171400EST
E) 15 M HEIGHT GLIDEPATH AND 4M  HEIGHT SHELTER AS OBSTACLE WITH
FOLLOWING PROPERTIES:
-AT STRIP AREA WEST OF RWY 16R/34L BTN TWYS A-B
-120M DISTANCE TO CL
- ELEVATION AT TOP FOR GLIDEPATH:141M
-ELEVATION AT TOP FOR SHELTER:119M
COORDINATES
ANTEN        381648.85N0270925.30E  TOP ELEVATION 126 M
SHELTER      381649.01N0270925.32E  TOP ELEVATION 115 M
-DUE TO CONSTRTUCTION WORKS FOR ILS MONTAGE AT RWY 16R/34L-
-OBSTACLES NOT MENTIONED AT AIP-
Was this helpful?