B2274/26
EST
Checking status...
OBSCrane Operations

Tower crane northeast of RWY 16L/34R and RWY 16R/34L is erected with obstacle lighting provided.

2026-06-04 13:30 - 2026-08-27 14:00
Duration:3 months EST

Period of Applicability

2026-06-04 13:30 - 2026-08-27 14:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Presence of a tower crane northeast of RWY 16L/34R and RWY 16R/34L, 2827 m from the runway centreline, within the inner horizontal surface. Crane elevation is 140 m AMSL, crane height is 25 m, and top elevation is 165 m AMSL. OPR continues H24 and obstacle lighting is provided during the operating period.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B2274/26 NOTAMN
Q) LTBB/QOBCE/IV/M  /A /000/999/3817N02709E005
A) LTBJ B) 2606041330 C) 2608271400EST
E) PRESENCE OF TOWER CRANE NORTHEAST OF RWY 16L/34R AND RWY 16R/34L,
2827 METERS FM RWY CL, WITHIN INNER HORIZONTAL SFC.
AREA WITH ELEVATION 140 METERS ABOVE MEAN SEA LEVEL COORDINATES:
BNDRY 1: 381953.04N0270928.06E
BNDRY 2: 381953.01N0270925.06E
BNDRY 3: 381955.03N0270924.05E
BNDRY 4: 381955.08N0270929.00E
CENTER: 381954.80N0270929.30E
ELEVATION : 140 M
CRANE HGT : 25 M
ELEVATION AT TOP : 165 M
-OPR CONTINUE H24 AND OBST LGT PROVIDED DURING OPR PERIOD-
Was this helpful?