J3251/26
Checking status...
OBSConstruction Activity

Construction obstacles, mounds, vehicles, and machinery may be present in the runway 06L/24R strip area between taxiways E and C.

2026-08-06 07:02 - 2026-11-06 20:30
Duration:LONG4 months

Period of Applicability

2026-08-06 07:02 - 2026-11-06 20:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Construction is taking place in the runway 06L/24R strip area, beginning 85 meters south of the runway and extending approximately 1,717 meters between taxiways E and C. Soil, sand, rubble, mobile vehicles, and working machinery may create obstacles or mounds within the work area, with a maximum elevation of 1,796.20 meters. Follow ATC instructions and exercise caution.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

J3251/26 NOTAMR J1955/26
Q) LTAA/QOBCE/IV/M  /A /000/999/4034N04307E005
A) LTCF B) 2608060702 C) 2611062030
E) CONST IN THE RWY 06L/24R STRIP AREA WITH FOLLOWING PROPERTIES:
-AFTER 85TH METERS SOUTH DIRECTION OF RWY 06L/24R
-BTN TWY E AND TWY C, APPROXIMATELY 1717 METERS
AREA COORDINATES:
403320N0430544E 403322N0430543E 403346N0430649E 403345N0430650E
403344N0430650E
MOUND MAY OCCUR IN WORKING AREA BECAUSE OF SOIL, SAND, RUBBLE ETC.
PRESENCE MOBILE VEHICLE OR WORKING MACHINE AS OBST IN WORKING AREA.
TOP OF ELEV: 1796.20M
ADVISE ATC INSTRUCTIONS AND BE CAUTIOUS.
Was this helpful?