B3010/26
Checking status...
ADRunway Operations

A construction vehicle is present northeast of the RWY 24L threshold without penetrating the RWY 06R/24L take-off/landing surface.

2026-07-31 10:59 - 2026-08-19 15:00
Duration:SHORTaggregated 6 days

Period of Applicability

2026-07-31 10:59 - 2026-08-19 15:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Construction work is in progress with a vehicle northeast of the RWY 24L threshold, 830 m from the threshold. The vehicle does not penetrate the take-off/landing surface of RWY 06R/24L. Follow ATC instructions. Daily schedule: 0800–1500.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B3010/26 NOTAMR B2756/26
Q) LTBB/QFAHW/IV/BO /A /000/999/4054N02919E005
A) LTFJ B) 2607311059 C) 2608191500
D) 0800-1500
E) WIP. PRESENCE A VEHICLE AT NORTH-EAST OF RWY 24L THR AND 830M
FROM RWY 24L THR.NOT PENETRATING TAKE OFF/LANDING SURFACE OF RWY
06R/24L DUE TO CONST WORKS.
COORDINATES: 405406.21N0292102.02E
ADVISE ATC INSTRUCTIONS
Was this helpful?