F0325/26
Checking status...
OBSConstruction Activity

Construction equipment on the south aerodrome boundary temporarily penetrates the OLS.

2026-08-06 00:00 - 2026-11-05 23:59
Duration:LONG4 months

Period of Applicability

2026-08-06 00:00 - 2026-11-05 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

A construction site is located on the south aerodrome boundary, where construction equipment temporarily penetrates the obstacle limitation surface (OLS) to a maximum height of 130 ft AMSL.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

F0325/26 NOTAMN
Q) LECM/QOBCE/IV/M  /A /000/999/3609N00521W005
A) LXGB B) 2608060000 C) 2611052359
E) CONSTRUCTION SITE ON SOUTH AD BOUNDARY. TEMPORARY OLS
PENETRATION BY CONSTRUCTION EQUIPMENT.
MAX HGT 130FT AMSL.