A1825/26
EST
Checking status...
NavApproach Procedures

RNP RWY 27 LPV minima are raised to the respective LNAV/VNAV minima.

2026-08-21 10:50 - 2026-11-21 23:59
Duration:LONG4 months EST

Period of Applicability

2026-08-21 10:50 - 2026-11-21 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

LPV minima for the RNP RWY 27 procedures with 2.5 percent and 5.0 percent ascent gradients shall be raised to the respective LNAV/VNAV minima, as referenced on AIP page AD 2-LZTT-7-7 and in accordance with ICAO Electronic Bulletin 2026/13.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1825/26 NOTAMR A1055/26
Q) LZBB/QPIXX/I /NBO/A /000/999/4904N02014E005
A) LZTT B) 2608211050 C) 2611212359EST
E) LPV MINIMA SHALL BE RAISED TO THE RESPECTIVE LNAV/VNAV MINIMA.
RNP RWY 27 ASC 2,5 PERCENT, REF PAGE AD 2-LZTT-7-7,
RNP RWY 27 ASC 5,0 PERCENT, REF PAGE AD 2-LZTT-7-7.
IN ACCORDANCE WITH ICAO ELECTRONIC BULLETIN 2026/13.
Was this helpful?