A0473/26
Checking status...
OBSCrane Operations

Four cranes are erected at multiple locations.

2026-08-06 15:25 - 2026-10-20 23:59
Duration:3 months

Period of Applicability

2026-08-06 15:25 - 2026-10-20 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Four cranes are erected: Crane 1 at 182534.61N 0694021.47W, elevation 55.6 m and height 37.6 m; Crane 2 at 182530.77N 0694019.91W, elevation 64.6 m and height 46.6 m; Crane 3 at 182532.57N 0694026.87W, elevation 73.2 m and height 55.2 m; and Crane 4 at 182529.19N 0694026.55W, elevation 55.6 m and height 37.6 m.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0473/26 NOTAMR A0336/26
Q) MDCS/QOBCE/IV/M/AE/000/003/1826N06940W001
A) MDSD B) 2608061525 C) 2610202359
E) MULTIPLE OBST ERECTED IN LOCATIONS:
CRANE 1 PSN 182534.61N0694021.47W ELEV 55.6M HGT 37.6M
CRANE 2 PSN 182530.77N0694019.91W ELEV 64.6M HGT 46.6M
CRANE 3 PSN 182532.57N0694026.87W ELEV 73.2M HGT 55.2M
CRANE 4 PSN 182529.19N0694026.55W ELEV 55.6M HGT 37.6M
Was this helpful?