Period of Applicability
2026-11-24 03:00 - 2026-12-24 10:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Aerodrome work is in progress near the threshold of runway 30, with an excavator operating daily from 0300 to 1000. The equipment is lighted, reaches 14.1 m (46.3 ft) AMSL, and caution is advised.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?