A0507/26
ADRunway Operations

An illuminated excavator is operating near the runway 30 threshold; exercise caution.

2026-11-24 03:00 - 2026-12-24 10:00
Duration:aggregated 10 days

Period of Applicability

2026-11-24 03:00 - 2026-12-24 10:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Aerodrome work is in progress near the threshold of runway 30, with an excavator operating daily from 0300 to 1000. The equipment is lighted, reaches 14.1 m (46.3 ft) AMSL, and caution is advised.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0507/26 NOTAMN
Q) MKJK/QFAHW/IV/BO/A/000/999/1756N07647W005
A) MKJP
B) 2611240300 C) 2612241000
D) DAILY 0300-1000
E) AD WIP. EXCAVATOR OPR IN VCY OF THR RWY 30 AT THE FLW: 175551.66N0764630.21W, 175551.65N0764630.20W, 175550.71N0764630.60W AND 175550.72N0764630.64W.
ELEV 14.1M/46.3FT AMSL. EQPT LGTD. CTN ADZ.
Was this helpful?