A4745/26
Checking status...
ADRunway Operations

Work in progress on the south side strips of runway 12L/30R between A3 and A8.

2026-05-27 18:15 - 2026-08-27 23:00
Duration:LONG4 months

Period of Applicability

2026-05-27 18:15 - 2026-08-27 23:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Work in progress on the south side strips of runway 12L/30R between taxiways A3 and A8.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A4745/26 NOTAMR A1665/26
Q) MMFR/QMWHW/IV/M/A/000/999/2102N08653W002
A) MMUN
B) 2605271815
C) 2608272300
E) SOUTH SIDE STRIPS RWY 12L/30R BTN TWYS A3 AND A8 WIP
Was this helpful?