A1097/26
Checking status...
ADRunway Operations

Runway 07 has construction work in progress and aircraft must follow a right 180-degree turn to vacate.

2026-06-02 18:36 - 2026-08-30 23:59
Duration:LONG3 months

Period of Applicability

2026-06-02 18:36 - 2026-08-30 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Runway 07 has construction work in progress south of the intermediate runway turning bay. After landing, aircraft shall make a right 180-degree turn prior to backtracking not less than 500 ft and beyond the intermediate turning bay to vacate the runway. Exercise caution.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

ORIGINAL NOTAM
(A1097/26 NOTAMN
Q)MHCC/QXXXX/IV/NBO/AE/000/999/1732N08818W005
A)MZBZ B)2606021836 C)2608302359
E)
RWY 07 CONSTRUCTION WIP SOUTH OF INTERMEDIATE RWY TURNING BAY.AFTER
LANDING AIRCRAFT SHALL MAKE RIGHT 180 DEG TURN PRIOR TO BACKTRACK NOT
LESS THAN 500FT AND BEYOND THE INTERMEDIATE TURNING BAY TO VACATE
RWY.EXERCISE CTN.)