P0241/26
EST
Checking status...
ADApron Operations

Apron congestion may require aircraft repositioning and cause minor ground delays.

2026-05-20 23:17 - 2026-08-20 22:30
Duration:aggregated 7 days EST

Period of Applicability

2026-05-20 23:17 - 2026-08-20 22:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Apron congestion during peak night operations. Aircraft repositioning may be required. All aircraft must comply with ATC and ground handling instructions. Minor ground delays may occur. Schedule: every Saturday 0400-1600.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

P0241/26 NOTAMN
Q) NZZO/QMNLT/IV/NBO/A /000/999/2112S15948W005
A) NCRG B) 2605202317 C) 2608202230EST
D) EVERY SAT 0400-1600
E) APN CONGESTION DURING PEAK NIGHT OPS. ACFT REPOSITIONING MAY BE
REQUIRED. ALL ACFT TO COMPLY WITH ATC AND GROUND HANDLING
INSTRUCTIONS. MINOR GROUND DELAYS MAY OCCUR
Was this helpful?