Period of Applicability
2026-10-11 20:00 - 2026-10-31 06:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
A crane is erected at the EFL Power Station in the CAAF compound, Namaka, near 17°45′38.03″S 177°26′37.16″E, with a maximum boom height of 30 m operating within a 20 m radius. It penetrates the runway 02 transitional surface by 0.1 m; airmen shall exercise caution. The crane operates daily from 2000 to 0600.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?