A0277/22
Checking status...
Procedure modification

Correction of procedure NDB RWY25.

2022-03-18 02:30 - PERM

Period of Applicability

2022-03-18 02:30 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The modification of AIP PAC-N includes a correction to the procedure for NDB RWY25, specifically regarding the time for reversal turn where the outbound track is 3 minutes and there is no time for the inbound track.

Message

MODIFICATION OF AIP PAC-N: CORRECTION OF PROCEDURE NDB RWY25: TIME FOR REVERSAL TURN: READ: -OUTBOUND TRACK: 3 MIN -INBOUND TRACK: NO TIME REF AIP: AD2 NLWF IAC 01

Map Visualization

Preview
Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0277/22 NOTAMN
Q) NFFF/QXXCH/I/BO/AE/000/999/1419S17804W999
A) NLWF B) 2203180230 C) PERM
E) MODIFICATION OF AIP PAC-N: CORRECTION OF PROCEDURE NDB RWY25:
TIME FOR REVERSAL TURN: READ:
-OUTBOUND TRACK: 3 MIN
-INBOUND TRACK: NO TIME
REF AIP: AD2 NLWF IAC 01