A0341/26
Checking status...
OBSCrane Operations

A crane will be erected near the runway 30R threshold.

2026-11-05 05:00 - 2026-11-19 13:00
Duration:SHORTaggregated 5 days

Period of Applicability

2026-11-05 05:00 - 2026-11-19 13:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

A crane 13 m high will be erected approximately 670 m from the runway 30R threshold on a magnetic bearing of 158°, between 0500 and 1300.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0341/26 NOTAMN
Q) OBBB/QOBCE/IV/M/AE/000/999/2616N05038E005
A) OBBI B) 2611050500 C) 2611191300
D) BTN 0500-1300
E) OBST CRANE WILL BE ERECTED AT HEIGHT 13M, POSITIONS AT APPROX
DIST 670M MAG BRG 158 DEG FROM RWY 30R THR
Was this helpful?