A1630/26
EST
Checking status...
ADRunway Operations

Construction and machinery operations are in progress along both sides of runway 09/27.

2026-07-25 08:43 - 2026-10-23 09:00
Duration:LONG4 months EST

Period of Applicability

2026-07-25 08:43 - 2026-10-23 09:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Construction work is in progress along both sides of runway 09/27, between 90 m and 150 m from the runway centerline. Machinery operates at a maximum height of 12 ft.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1630/26 NOTAMR A0824/26
Q)OIIX/QMWHW/IV/M/A/000/999/
A)OIGG B)2607250843 C)2610230900EST
E)CONST WORK  IN PROGRESS ALONG BOTH SIDES OF RWY 09/27:
DIST FM RCL : 90 M UP TO 150 M,
MACHINARY OPR WITH MAX HGT : 12 FT.