A0960/25
EST
Checking status...
OBSConstruction Activity

Construction work in progress along both sides of RWY 09/27.

2025-03-15 05:00 - 2025-05-28 14:30
Duration:3 months EST

Period of Applicability

2025-03-15 05:00 - 2025-05-28 14:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Construction work is ongoing along both sides of runway 09/27, with distances from the runway centerline ranging from 90 meters to 150 meters, and machinery operating at a maximum height of 12 feet.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0960/25 NOTAMR A4973/24
Q) OIIX/QMWHW/IV/M/A/000/999/
A) OIGG B) 2503150500 C) 2505281430 EST
E) CONST WORK  IN PROGRESS ALONG BOTH SIDES OF RWY 09/27:
DIST FM RCL: 90 M UP TO 150M ,
MACHINARY OPR WITH MAX HGT : 12 FT.
Was this helpful?