Period of Applicability
2026-10-12 05:44 - 2027-01-10 20:30
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Military arresting systems are installed at runway 10/28: a net barrier for runway 10 at stopway 10, 30 m before the runway 28 threshold, 20 ft AGL, with operating facilities on both sides 35 m from the extended runway centerline; and a hook barrier for runway 28 at stopway 10, 15 m before the runway 28 threshold, 1.7 ft AGL, with operating facilities on both sides 25 m from the extended runway centerline.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?