A0423/22
Checking status...
Procedure change

Change from RNAV(GNSS) to RNP approach procedures for runways 26L and 08R.

2022-12-01 00:00 - PERM

Interpretation

The IAC procedures for runways 26L and 08R have been changed from RNAV(GNSS) to RNP, as reference in the AIP.

Message

FLW IAC TO BE READ: 1-RNP RWY 26L INSTEAD OF RNAV(GNSS)RWY 26L 2-RNP RWY 08R INSTEAD OF RNAV(GNSS)RWY 08R REF AIP:AD 2.24.8-8,AD 2.24.8-10,SUP 01/22 AND SUP 06/18

Map Visualization

Preview
Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0423/22 NOTAMN
Q) OJAC/QPIXX/I /NBO/A /000/999/3143N03600E005
A) OJAI B) 2212010000 C) PERM
E) FLW IAC TO BE READ:
1-RNP RWY 26L INSTEAD OF RNAV(GNSS)RWY 26L 
2-RNP RWY 08R INSTEAD OF RNAV(GNSS)RWY 08R
REF AIP:AD 2.24.8-8,AD 2.24.8-10,SUP 01/22 AND SUP 06/18