Period of Applicability
2026-06-18 14:24 - 2026-08-06 09:01
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Instrument approach procedure RNP RWY 12 is changed. VGSI and RNAV glidepath are not coincident (VGSI angle 3.00/TCH 80). Minima are amended as published: LNAV/VNAV DA CAT A 470/900M 355 (300-900M), CAT BC 480/1000M 365 (400-1000M), CAT D 490/1000M 375 (400-1000M); LNAV MDA 550/1300M 435 (400-1300M), with ALS inop increases for CAT AB to RVR/VIS 1500M and CAT CD to 1700M or 2000M as stated.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?